Output points: 24 points.
Voltage: AC100 ~ 240V.
OFF leakage current: 0.1mA.
Output type: bidirectional thyristor output.
Response time: 0.5Hz+1ms.
36 point terminal station A0J2E-E32D PDF.
With short circuit protection.
With the surge absorber.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor
A0J2E-E32D
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal A0J2E-E32D PDF.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A0J2E-E32D PDF.
MITSUBISHI PLC is tthe main product in the production of MITSUBISHI motor in Dalian A0J2E-E32D Manual.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process MITSUBISHI User's Manual.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points MITSUBISHI User's Manual MITSUBISHI User's Manual. Multi axis positioning controller.
Program capacity: Max 60K step.
Input / output points: 1920 points.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be knoown,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A0J2E-E32D Manual A0J2E-E32D User's Manual.