Description: supporting the use of AJ65BT-RPI-10A and AJ65BT-RPT-10B, support 156K/625K/2.5Mbps.
Station type: take up 1 stations for the remote I/O.
Spare 5 products for different purposes A0J2HCPUP21 PDF.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure.
Spring clip terminal type relay hub.
Star type wiring, length of the main line, spring clamping terminal table type
A0J2HCPUP21
Relay appliance (T branch) unit.
Extension of T type branch and trunk length.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line A0J2HCPUP21 PDF.
Relay unit in space light.
Communication between linear moving bodies. Cable length: 3 meters.
For GOT and parallel printer connection. Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0 A0J2HCPUP21 PDF. 1A.
External connection: 2 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Input points: 32 points.
Voltage: DC12/24V MITSUBISHI User's Manual.
Current: 3/7mA.
Response time: 10ms.
16 points / a common end.
Positive pole sharing.
36 point terminal station.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh proocess A0J2HCPUP21 Manual . When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read MITSUBISHI User's Manual.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control reequirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A0J2HCPUP21 User's Manual.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A0J2HCPUP21 Manual .
Read only memory. Manufacturers use, content can not be changed, power does not disappear.