Output type: bidirectional thyristor output.
Output points: 16 points.
OFF leakage current: 1.5mA following (AC100V) below /3mA (AC200V).
Output protection function: No A2ACPUR21 PDF.
Rated load voltage / current: AC100V~240V/0.6A.
External connection: 2 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool
A2ACPUR21 MELSECNET/MINI (-S3) data link system, A2C system transfer converter A2ACPUR21 PDF.
Twisted pair cable - plastic optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations A2ACPUR21 PDF.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc MITSUBISHI User's Manual. .
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program MITSUBISHI User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. DC input points: 32 points.
Input volttage and current: 3/7mA, DC12/24V MITSUBISHI User's Manual A2ACPUR21 Manual .
Response time: 10ms.
Positive pole sharing.
Output points: 16 points.
Output voltage and current: 100mA/1, DC12/24V point.
Response time: 2ms.
48 point /1 public side (input and output sharing).
Output form: transistor output, leakage type.
40 pin connector.
Number of stations: 1 stops.
Type remote I/O unit (twisted pair data connection).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, andd the timeliness is strong A2ACPUR21 User's Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A2ACPUR21 Manual .
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.