LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A80BDE-J61BT13 User's Manual (For SW4DNF-CCLINK-B) PDF

MITSUBISHI A80BDE-J61BT13 User's Manual (For SW4DNF-CCLINK-B) PDF

Brand: MITSUBISHI
Product model: A80BDE-J61BT13
Name: CC-Link System Local Interface Board
Sort: User's Manual (For SW4DNF-CCLINK-B)
File language: English
File size: 1.60MB
Applicable models:
AJ65VBTS - - - type.
AJ65VBTCE - - - type.
AJ65VBTCU - - - type.
AJ65ABTP - - - type.
AJ65VBCU- - type.
AJ65SBT-CLB type. SI/QSI/H-PCF/ wide H-PCF optical cable dual layer remote I/O network (remote I/O station)
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A80BDE-J61BT13 PDF A80BDE-J61BT13
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic A80BDE-J61BT13 PDF.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of A80BDE-J61BT13 PDF.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI User's Manual MITSUBISHI User's Manual.
This phenomenon is called the I/O delay time effect. Output points: 64 points.
Voltage: DC12/24V.
OFF leakage current: 0.1mA.
Output type: transistor output (type sink).
Response time: 2ms.
32 points / a common end.
40 pin connector.
With circuit breaker protection function.
With the surge absorber MITSUBISHI User's Manual.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh A80BDE-J61BT13 Manual.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requuirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A80BDE-J61BT13 User's Manual.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A80BDE-J61BT13 Manual.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.