LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A953GOT-SBD-B User's Manual (Hardware) PDF

MITSUBISHI A953GOT-SBD-B User's Manual (Hardware) PDF

Brand: MITSUBISHI
Product model: A953GOT-SBD-B
Name: touch screen
Sort: User's Manual (Hardware)
File language: English
File size: 0.94MB
3C-2V/5C-2V coaxial cable between double loop PC (control station / common station) / remote I/O network (remote master station).
Q mode.
When the programmer input programinto the user program memory,
Then CPU according to the function of the system (the system program memory to explain the compiler),
Translate the user program into PLC internally recognized by the user to compile the program A953GOT-SBD-B PDF A953GOT-SBD-B
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CPU.
The result is stored in the output image register or the working data memory,
And then output to the output interface, conttrol the external drive A953GOT-SBD-B PDF A953GOT-SBD-B Manual.
Semiconductor circuit with memory function.
System program memory and user memory.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation A953GOT-SBD-B PDF.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
User memory: user program storage area and work data storage area.
Composed of random access memory (RAM) MITSUBISHI User's Manual. User use.
Power cut off. Commonly used efficient lithium battery as a backup power supply, life is generally 3~5 years. Input voltage range: AC100-120V/AC200-240V.
Output voltage: DC24V.
Output current: 1.2A additional power supply unit.
I/O points is an important indicator of PLC MITSUBISHI User's Manual.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity aand switch quantity of the controlled object,
Generally an input / output element to take up an input / output point MITSUBISHI User's Manual A953GOT-SBD-B User's Manual.
Taking into account the future adjustment and expansion,
In general should be estimaated on the total number of points plus the amount of spare 20%~30% A953GOT-SBD-B Manual.
The following describes the centralized control system I/O points of the estimate.