Input voltage range: AC100-120V/200-240V.
Output voltage: DC-15/15V.
Output current: A616DAV 0.7A/1.2A, for A616DAI.
I/O slot installation.
Is the analog output unit (A616DAV, A616DAI) dedicated power supply A960GOT-EBA-EU PDF.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest
A960GOT-EBA-EU
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point A960GOT-EBA-EU PDF.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
The following describes the centralized control system I/O points of the estimate. DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V A960GOT-EBA-EU PDF.
Response time: 10ms.
Positive pole sharingg A960GOT-EBA-EU Manual.
16 point /1 a public side.
Output points: 12 points.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end.
Output form: transistor output, leakage type MITSUBISHI User's Manual.
36 point terminal station.
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system MITSUBISHI User's Manual.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add MITSUBISHI User's Manual.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and thee timeliness is strong A960GOT-EBA-EU User's Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A960GOT-EBA-EU Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.