8228此ID下载地址不存在1--/PDFManualEN/Mitsubishi-A985GOT-TBA-EU_A975GOT-TBA-EU_A970GOT-TBA-EU_A970GOT-SBA-EU_A970GOT-LBA-EU_A960GOT-EBA-EU-users-(Hardware).pdf MITSUBISHI A970GOT-TBD-CH User's Manual (Hardware) PDF - MITSUBISHI
LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-TBD-CH User's Manual (Hardware) PDF

MITSUBISHI A970GOT-TBD-CH User's Manual (Hardware) PDF

Brand: MITSUBISHI
Product model: A970GOT-TBD-CH
Name: Graphic Operation Terminal
Sort: User's Manual (Hardware)
File language: English
File size: 0.00MB
Output points: 24 points.
Voltage: DC24V/AC240V, 2A/1 point, 5A/1 public end.
OFF leakage current: 0.1mA.
Output type: relay output.
Response time: 12ms A970GOT-TBD-CH PDF.
8 point /1 a public side.
36 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A970GOT-TBD-CH
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal A970GOT-TBD-CH PDF.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A970GOT-TBD-CH PDF.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of varioous types of machinery or production process MITSUBISHI User's Manual A970GOT-TBD-CH Manual.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points MITSUBISHI User's Manual MITSUBISHI User's Manual. For common cathode input module and leaky type output module (2 line type).Twisted pair cable.
Single bus.
MELSECNET/B (Master / local station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. Affter MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A970GOT-TBD-CH User's Manual.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A970GOT-TBD-CH Manual. .