Type of input: DC leakage.
Input points: 32 points.
Input voltage: DC12/24.
Input current: 3/7mA.
Output type: transistor drain type.
Output points: 32 points A975GOT-TBA-B PDF.
Common public end points: 32.
PLC is introduced by the relay control technology after the development of micro processing technology,
Can be easily and reliably used for switching control.
As the analog quantity can be converted into digital quantity, the number of digital quantity is just a number of switching value,
Therefore, after the conversion of analog, PLC can also be reliable for processing control
A975GOT-TBA-B
Because the continuous production process often has the analog quantity, the analog quantity control is sometimes called process control A975GOT-TBA-B PDF.
Analog quantity is not electricity, and PLC can only handle digital quantity, quantity of electricity.
All to realize the conversion between them to have the sensor, the analog quantity into a number of power A975GOT-TBA-B PDF.
If this power is not standard, but also through the transmitter,
The non-standard power into a standard electrical signal, such as 1-5V, 4-20mA, 0-10V, etc..
At the same time, there is also an analog input unit (A/D),
Transform these standard electrical signals into digital signals,
The analog output unit (D/A), in order to transform the digital quantity after PLC processing into analog quantity -- standard electric signal MITSUBISHI User's Manual.
So the standard telecommunication nuumber, the conversion between the number of operations to use a variety of computing A975GOT-TBA-B Manual.
This requires the resolution of the analog unit and the standard electrical signal MITSUBISHI User's Manual. Screw terminal table type.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction MITSUBISHI User's Manual.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-linne unification to adjust A975GOT-TBA-B User's Manual.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A975GOT-TBA-B Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.