Output type: transistor source / drain type.
Output points: 8 points.
Load voltage: DC5/12/24/48.
Load current: 2A.
Connection mode: terminal row.
Common public end points: 1 AX81-S3 PDF.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AX81-S3 PDF
AX81-S3
So, sometimes also known as the order control.
And ssequential control is divided into manual, semi-automatic or automatic AX81-S3 Manual.
And the control principle is decentralized, centralized and hybrid control three. RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops AX81-S3 PDF.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI User's Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction MITSUBISHI User's Manual.
Design control cabinet and the operating table and other parts of the electrical wiring diagram aand wiring diagram AX81-S3 User's Manual.
Electrical interconnection diagram of each part of the design system MITSUBISHI User's Manual.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced AX81-S3 Manual.