Output type: transistor output, source.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0 A1SJCPU-S8 PDF. 1A.
External connection: 3 wire.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting
A1SJCPU-S8
3 wire sensor input. Multi axis positioning controller.
Coaxial data communication line function.
Program capacity: Max 60K step.
Input / output points: 1920 points.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A1SJCPU-S8 PDF.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal A1SJCPU-S8 PDF.
The output of the PLC mainly consider the speed command signal positive 1~3 levell, 1~3 level, allowing reverse switching signal and brake open signal etc A1SJCPU-S8 Manual . .
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points MITSUBISHI Programming Manual. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable - plastic fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered MITSUBISHI Programming Manual.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI Programming Manual.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program siimulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A1SJCPU-S8 Manual A1SJCPU-S8 Programming Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.