Can connect the transmitter units 2 units using radius of about 50 meters (outdoor 200 meters).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program A2ACPUP21-S4 PDF.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system
A2ACPUP21-S4
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A2ACPUP21-S4 PDF.
The main contents of the initialization program are: to some data arrea, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A2ACPUP21-S4 Manual . . RS-232 1 channels.
With DC input 2 points.
Transistor output 2 A2ACPUP21-S4 PDF.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step MITSUBISHI Programming Manual.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be MITSUBISHI Programming Manual.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring ddiagram A2ACPUP21-S4 Programming Manual.
Electrical interconnection diagram of each part of the design system MITSUBISHI Programming Manual.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced A2ACPUP21-S4 Manual .