Cable length: 3 meters
Extending cable to connect CPU main substrate and extended substrate,
According to the model can provide different cable length,
If you need to connect the AnN type expansion substrate is required,
Selection of A1SC05NB (A1SC07NB) cable A951GOT-QTBD PDF. For A6TBXY36/A6TBXY54/A6TBX70E (common cathode; drain type) long 5m.5 slots.
Can be installed in the power supply unit for A series units installed QnA/
A951GOT-QTBD
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage A951GOT-QTBD PDF.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load A951GOT-QTBD PDF.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest MITSUBISHI Operating Manual.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30% MITSUBISHI Operating Manual.
The following describes the centralized control system I/O points of the estimate. PLC station distance: 500M.
Cable type: coaxial cable.
The function of the MELSECNET interface module is to connect the main CPU PLC to the MELSECNET data communication system MITSUBISHI Operating Manual.
As long as the switch on the component to set,
Can determine the CPU PLC is as the main station or in situ station.
There are two modules available for selection: one is the connection of the optical cable network and the network of the coaxial cable.
For a ANSCPU, up to only a piece of interface components can be inserted, A2ASCPU can be inserted 2.
The popularization andd application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment A951GOT-QTBD Manual.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
The instruction list programming language is a programming language similar to assembly language mnemonic,
As well as assembly language by the operation code and the number of operations.
In the case of the computer for the PLC handheld programmer compile user program.
At the same time, the programming language of the instruction list corresponds to the ladder diagram programming language,
In PLC programming software can be converted to each other. Figure 3 is the instruction sheet corresponding to the ladder diagram of figure 2PLC.
The characteristics of instruction table programming languaage is used to represent mnemonic operation function,
Easy to remember, easy to grasp;
In the handheld programmer on the keyboard using the mnemonic representation, easy to operate, can be programmed in computer;
There is a one-tto-one correspondence between the ladder diagram and the ladder diagram A951GOT-QTBD Manual A951GOT-QTBD Operating Manual. Its characteristics are basically consistent with the ladder diagram language.