DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
16 point /1 a public side.
Positive pole sharing.
Output points: 12 points A951GOT-SBD-M3 PDF.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public end, 3 point /1 a common end, independent contact.
Output form: relay output.
36 point terminal station
A951GOT-SBD-M3
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A951GOT-SBD-M3 PDF.
MITSUBISHI PLC detection, fault diagnosis and display and other procedurees A951GOT-SBD-M3 Manual.
These procedures are relatively independent, generally in the basic completion of the program design and then add A951GOT-SBD-M3 PDF.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI Operating Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer MITSUBISHI Operating Manual. Self service (IN, OUT): SI optical cable.
Other aspects (IN, OUT): SI optical cable.
Data link anomaly Bureau bypass.
Inter agency extension.
Cable transformation. Cable 0.6m for the expansion of the floor, the expansion of a floor for every 1 units MITSUBISHI Operating Manual. Program 1 channel connection, AnCPU/QnACPU use.
MITSUBISHI PLC detection,, fault diagnosis and display and other procedures A951GOT-SBD-M3 Operating Manual.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
MITSUBISHI PLC protection and chain procedures.
Protection aand chain is an indispensable part of the program, must be carefully considered A951GOT-SBD-M3 Manual.
It can avoid the control logic confusion caused by illegal operations.