Series Name: A950GOT.
Size: 6 inches.
Resolution: 320 * 240.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: DC24V A951GOT-SBD PDF.
Built in RS-422 communication interface
Memory card: 3M.
Some mechanical industries, such as machine tools, textile machinery, electronic equipment and other industries,
In the country has been developed for decades of history, relatively speaking, is relatively mature industry, in the long run,
These industries also exist the needs of equipment upgrades
A951GOT-SBD
In this upgrading process, there will be some small, has been using relatively low-end products manufacturers are eliminated,
But there are also a lot of enterprises in the process of equipment renewal,
Re positioning the needs to find those that can meet their development plans,
Equipment suppliers to help them improve their productivity A951GOT-SBD PDF. CC-Link peripheral device connection A951GOT-SBD PDF.
RS-422 + CC-Link. 10BASE5.
For Q mode.
Control layer /MELSECNET/10 (H) is the middle layer of the whole network system,
Control network which is convenient and high speed processing data transmissioon between PLC, CNC and other control equipment A951GOT-SBD Manual.
As MELSEC control network MELSECNET/10,
With its good real-time performance, simple network settings, no procedures of the network data sharing concept,
As well as the redundant circuit and so on, has obtained the very high market appraisal,
The number of devices to reach the highest in japan,
In the world is also one of the few MITSUBISHI Operating Manual.
And MELSECNET/H not only inherited the excellent characteristics of MELSECNET/10,
Also makes the network real-time better, more data capacity,
Further adapt to the needs of the market MITSUBISHI Operating Manual. Can connect the transmitter units 2 units using radius of about 50 meters (outdoor 200 meters).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program MITSUBISHI Operating Manual.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. A951GOT-SBD Operating Manual. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A951GOT-SBD Manual. .