DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
16 point /1 a public side.
Positive pole sharing.
Output points: 12 points A970GOT-LBD PDF.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public end, 3 point /1 a common end, independent contact.
Output form: relay output.
36 point terminal station
A970GOT-LBD
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A970GOT-LBD PDF.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add A970GOT-LBD PDF.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI Operating Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer MITSUBISHI Operating Manual. Enter points: 64 points.
Input voltage: DC7V above.
Input response time: 16ms.
16 pin connector.
Output points: 64 points.
Output response time: 16ms.
Output type: transistor output.
32 pin connector.
Dynamic input and output.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control tto 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points MITSUBISHI Operating Manual A970GOT-LBD Manual.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission devvice, brake signal and fan fault signal A970GOT-LBD Operating Manual.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drivee system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A970GOT-LBD Manual.