LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-TBD-CH Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual) PDF

MITSUBISHI A970GOT-TBD-CH Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual) PDF

Brand: MITSUBISHI
Product model: A970GOT-TBD-CH
Name: touch screen
Sort: Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual)
File language: English
File size: 3.00MB
Input points: 16 points.
Input voltage and current: 120V ~ 6mA AC100.
Input response time: 30ms.
16 point /1 a public side.
Output points: 16 points.
Output voltage: DC24V/AC240V, 2A/1 point, 4A/ common end A970GOT-TBD-CH PDF.
Output response time: 12ms.
Output type: relay.
8 point /1 a public side.
50 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A970GOT-TBD-CH
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, tthe fault signal transmission device, brake signal and fan fault signal A970GOT-TBD-CH PDF A970GOT-TBD-CH Manual.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A970GOT-TBD-CH PDF.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process MITSUBISHI Operating Manual.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a llight sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points MITSUBISHI Operating Manual MITSUBISHI Operating Manual A970GOT-TBD-CH Manual A970GOT-TBD-CH Operating Manual.
Cable length: 30 meters.
PC to GOT long distance connection cable.
For connection between GOT and GOT.
Related products