LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A975GOT-TBD-B Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual) PDF

MITSUBISHI A975GOT-TBD-B Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual) PDF

Brand: MITSUBISHI
Product model: A975GOT-TBD-B
Name: touch screen
Sort: Operating Manual (SW4D5C-GOTR-PACKE compatible Extended/Option Functions Manual)
File language: English
File size: 3.00MB
QnA/ACPU bus connection.
1 joint.
Applicable models: A985 (-V) /975/970/960GOT. Output type: transistor output, source.
Output points: 16 points.
OFF leakage current: 0 A975GOT-TBD-B PDF. 30mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 2 wire.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module A975GOT-TBD-B
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong A975GOT-TBD-B PDF.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness A975GOT-TBD-B PDF.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Special multi axis positioning controller for NSD servo system.
Optical data communication line MITSUBISHI Operating Manual.
Program capacity: Max 60K step.
Input / output points: 1920 points.
When the switch is off, the diode does not emit light, and the transistor is not on the way. Internal circuit input signal.
It is through the input interface circuit to the external switch signal into PLC internal can accept the digital signal MITSUBISHI Operating Manual.
Photoelectric three levels: in the light of the light signal conductiion, the degree of light signal and the intensity of the light signal A975GOT-TBD-B Manual.
The output signal has a linear relationship with the input signal in the linear operating region of the photoelectric coupler MITSUBISHI Operating Manual.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The photoelectric coupler is composed of two luminous two extreme tubes and a photoelectric transistor.
Light emitting diode two: the input of a photo coupler and the change of electrical signal,
The light signal is generated by the light emitting diode, which is the same as the input signal A975GOT-TBD-B Operating Manual.
The working process of the input interface circuit: when the switch is closed, the diode light,
The transistor is then guided to the internal circuit and input signal under the irradiation of the light A975GOT-TBD-B Manual.