Input: AC100 ~ 120v/200 ~ 240v,
Output: 5A DC5V.
PLC programming has a wide range of applications, powerful, easy to use, has become one of the main devices of modern industrial automation,
In all areas of industrial production has been widely used,
Applications in other areas (such as civil and home automation) have also been rapidly developed A985GOT-TBA-V PDF.
It uses programmable memory,
An instruction used to perform logical operations, sequence control, timing, counting and arithmetic operations in its internal storage,
And through digital, analog input and output,
Control of various types of machinery or production processes A985GOT-TBA-V PDF
A985GOT-TBA-V Programmable controller and related equipment,
Should be easy to make the industrial control system to form a whole, easy to expand the principle design of its functions.
As can be seen from the above definition, PLC is a program to change the control function of the industrial control computer,
In addition to the completiion of a wide variety of control functions, as well as with other computer communications networking features A985GOT-TBA-V PDF A985GOT-TBA-V Manual. 3C-2V/5C-2V coaxial cable.
Single bus.
Remote I/O network (remote control station).
How to choose MITSUBISHI PLC.
MITSUBISHI PLC options include the choice of MITSUBISHI PLC models, capacity, I/O module, power, etc MITSUBISHI Operating Manual. .
MITSUBISHI PLC distribution I/O points and design MITSUBISHI PLC peripheral hardware circuit
Draw the I/O point of the PLC and the input / output device connection diagram or the corresponding table,
This part also can be carried out in second steps MITSUBISHI Operating Manual.
Design PLC peripheral hardware circuit.
Draw the electrical wiring diagram of the other parts of the system,
Including the main circuit and the control circuit does not enter the PLC, etc..
The electrical schematic diagram of the system composed of I/O PLC connection diagram and PLC peripheral electrical circuit diagram MITSUBISHI Operating Manual.
So far the system''s hardware electrical circuit has been determined. SUMINET-3200 network.
MITSUBISHI PLC detectionn, fault diagnosis and display and other procedures A985GOT-TBA-V Operating Manual.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
MITSUBISHI PLC protection and chain procedures.
Protection aand chain is an indispensable part of the program, must be carefully considered A985GOT-TBA-V Manual.
It can avoid the control logic confusion caused by illegal operations.