LK166
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI AD57-S1 User's Manual PDF

MITSUBISHI AD57-S1 User's Manual PDF

Brand: MITSUBISHI
Product model: AD57-S1
Name: CRT/LCD Controller Module
Sort: User's Manual
File language: English
File size: 1.73MB
Output type: transistor source.
Output points: 16 points.
Load voltage: DC12/24.
Load current: 0.8A.
Connection mode: terminal row.
Common public end points: 8 AD57-S1 PDF.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AD57-S1 PDF AD57-S1
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three. A8UPU, A8PU software packageInput type: DC input, positive public end / negative public end AD57-S1 PDF.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type AD57-S1 Manual .
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 1 line /1 line type MITSUBISHI User's Manual.
40 pin connector type (FCN connector type).
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong MITSUBISHI User's Manual.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI User's Manual.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Cable for unit load.
Length: 80mm.
Input / output unit standard equipment.
MITSUBISHI PLC programm simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AD57-S1 Manual AD57-S1 User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
Large CPU expansion cable
GT15-A370C25B-S1
MITSUBISHI Large CPU expansion cable GT15-A370C25B-S1
Cale length: 2.5m. For motion controller CPU
MITSUBISHI
CPU unit
A2ACPUP21-S1
MITSUBISHI CPU unit A2ACPUP21-S1
Input and output points: 1024 points. Input /
MITSUBISHI
Temperature control module
A1S64TCTT-S1
MITSUBISHI Temperature control module A1S64TCTT-S1
Numer of channels: 4 channels. Sensing metho
MITSUBISHI
High speed counting module
A1SD62D-S1
MITSUBISHI High speed counting module A1SD62D-S1
2 channels. 200/10kpps. Count input signal: R