Number of input channels: 4ch.
Input voltage: DC - 10 ~ 10V.
Input current: DC0 ~ 20mA.
Conversion speed: 20 s/ch.
Resolution: 1/20000.
By shifting the function easily when the system starts to fine tune the movement function L26CPU-PBT PDF.
Shift the set value to (shift to) the function of the digital output value.
If you change the conversion value, the value is reflected in real time to the value of the scale (numeric value),
Can easily complete the fine-tuning of the system startup
L26CPU-PBT
Extended detection method based on usage
Anomaly detection and extension of input signal
The detection method of the abnormal detection function of the input signal can be extended to detect the abnormal detection function of the input signal which is outside the range of the set range L26CPU-PBT PDF L26CPU-PBT Manual.
For the detection of the lower limit or the upper limit of the input signal abnormality, or when the detection of the broken line is performed L26CPU-PBT PDF.
Enter range extension
Range of scalable input range.
Combined with the abnormal detection function of the input signal, the broken line can be easily detected. Differential output.
Axis of control: 1.
Maximum output pulse: pulse/s 4M.
Location data: 600 data / axis.
Max link distance: 10m MITSUBISHI User's Manual.
Start is also simple.
Digital oscilloscope function.
Data collection and data collection in a simple motion controller that is synchronized with the control period.
Waveform display, you can improve the efficiency of the start.
The use of steps in accordance with the auxiliary function can be MITSUBISHI User's Manual.
Can be set by different uses of the probe, easy to view the data set.
Can be on the word 16CH, bit 16CH data sampling.
Among them, the word 8CH, bit 8CH data can be displayed inn real time L26CPU-PBT User's Manual.
Monitoring and testing function
Through a wealth of monitoring and testing functions, you can simply start and action check MITSUBISHI User's Manual.
Can only choose the necessary items from the rich monitoring information and monitor the display L26CPU-PBT Manual.
Through the test function, do not have to control procedures can also be implemented to confirm the basic action.