Meet safety standards: EN954-1 class 4, 13849-1 PL e ISO.
Safe input points: 1 points (2 input).
Start input points: 1.
Input type: N type (positive public end / negative public end input)
Safe output points: 1 points (3 output) Q00JCPU PDF.
Spring clip terminal.
Additional security system.
Simply connect to the existing CC-LINK, you can add an independent security features.
Saving wiring by CC-link connection
Q00JCPU
The wiring is not needed in particular to the condition monitoring of the safety relay module, and realizes the wiring of the cabinet and the other provinces.
Visualization of installation status Q00JCPU PDF.
Can monitor the safe output, as well as the safety input and the internal state of the relay, in the safety circuit to facilitate the identification of the reasons for the start. Multimode fiber optic cable.
Double circuit.
Controller network (control station / common station).
With external power supply function Q00JCPU PDF.
Decentralized control of large scale controller,
IE CC-Link controller network module connected with various field network.
Effectively using Ethernet cable and connector on the market, can reduce the cost.
The performance of the cycle data update is improved.
The transmission delay time is shortened, and the synchronous waiting time of the application can be shortened MITSUBISHI Strctured Programming Manual.
On the same network to achieve the 256KB network shared memory (cycle data).
No need to distinguish the network can handle large capacity data.
QJ71GP21S-SX, CC-Link can be used as the control station of IE QJ71GP21-SX controller network, common station MITSUBISHI Strctured Programming Manual. PCI bus.
Support Japanese, English OS.
Master / local station sharing.
Support Ver.2 CC-Link version.
I/O control in the first class of open field network module.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information) MITSUBISHI Strctured Programming Manual.
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of.
Even if the information reaches saturation, it will not affect the link scan time.
Make the mixed data environment inteelligent, to achieve a new manufacturing system IE CC-Link field network module Q00JCPU Manual.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
MELSECNET/H network module capable of composing large scale flexible network system.
The MELSECNET/H network system includes the PLC network of the control station and the communication between the stations and the remote I/O network in the remote station remote I/O station.
Optical fiber loop system...... High speed communication of 10Mbps/25Mbps is realized.
The distance bbetween stations, the length of the total cable length, strong anti-interference Q00JCPU Strctured Programming Manual.
Coaxial bus system...... Using low cost coaxial cable, the network construction cost is lower than that of the optical fiber loop network.
Twisted pair bus system Q00JCPU Manual. ..... Combined with high performance price ratio network module and twisted pair cable,
The construction cost of network system is very low.