Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 1 wire.
40 pin connector type (FCN connector type).
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices A1SX41-S2 PDF.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong
A1SX41-S2
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness A1SX41-S2 PDF.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. A0J2 56.
Input / output unit 2
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A1SX41-S2 PDF.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Input points: 16 points.
Input voltage and current: 120V ~ 6mA AC100.
Input response time: 30ms.
16 point /1 a public side.
Output points: 16 points.
Output voltage: DC24V/AC240V, 2A/1 point, 4A/ common end.
Output response time: 12ms.
Output type: relay.
8 point /1 a public side.
50 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be knownn,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A1SX41-S2 datasheet A1SX41-S2 datasheet.