SRAM PC card.
Applicable models: A95_GOT (-M3) /A956WGOT. "Series Name: A975GOT.
Size: 10 inches.
Resolution: 600 * 480.
Display device: D-STN monochrome display.
Display color: monochrome (white and black).
Power supply: AC100-240V.
Memory card: 1M.
Authentication: UL/cUL/CE.
Man machine interface is the interface between man and machine in the field of information exchange and function contact or influence,
Information exchange, functional contact or mutual influence, the hard contact and soft touch of a person and machine,
This interface includes not only the direct contact point line side,
It also includes the function of remote information transmission and control AC12B PDF
AC12B
The man-machine interface is the central link in the man-machine system,
Mainly from the safety engineering branch of the safety ergonomics to study and put forward the basis for the solution,
And over the safety engineering equipment engineering, safety management engineering and safety systems engineering to study the specific solutions and measures to the safety of human computer science and technology AC12B PDF.
It realizes the transformation between the internal form of information and the acceptable form of human being AC12B PDF. DC input points: 16 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC programm simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AC12B datasheet AC12B datasheet.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.