Ontology CPU installation to P-ROM program device.SRAM PC card.
Applicable models: A95_GOT (-M3) /A956WGOT. "Output type: transistor source.
Output points: 16 points.
Load voltage: DC12/24.
Load current: 0.8A.
Connection mode: terminal row.
Common public end points: 8.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF AJ55TB2-16R PDF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC
AJ55TB2-16R
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order AJ55TB2-16R PDF.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three. According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system AJ55TB2-16R PDF.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc.. "2 channels.
10kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Output: DC12/24V, 0.5A.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLLC,
To determine the I/O PLC points AJ55TB2-16R datasheet.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book AJ55TB2-16R datasheet.