Master / local station.
QnACPU use.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system AX81-S1 PDF.
MITSUBISHI PLC initialization procedure
AX81-S1 After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc AX81-S1 PDF. . "CPU:A3UCPU PLC is the same.
PLC program capacity: 30K step.
I/O points: 2084 points.
Processing speed (sequential order): 0.15 s/ step.
Control axis: up to 32.
Servo program capacity: 14K step.
Servo amplifier: SSCNET connected external servo amplifier.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive AX81-S1 PDF.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC. Fast connector type.
Current input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on--line unification to adjust AX81-S1 datasheet.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step AX81-S1 datasheet.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.