Power supply voltage: 100 to 240 VAC.
Heater control method: ON/OFF control SSR control.
Input specifications: Two current inputs,
(for either single phase or threephase).
Output specifications: Two transistor outputs.
Communications output: RS-485.
Current input range: 0.200 to 2.200 A.
A high-precision Heater Element K8AB-VS2 AC100/115V PDF.
Burnout Detector compatible with a,
wide-range of heater control methods
K8AB-VS2 AC100/115V
Push-in terminals reduce the workload.
Scaling.
NPN or PNP equivalent output.
Lineup includes models compatible with many heater control methods,
including ON/OFF control, phase control, and cyclic control.
High-precision heater burnout alarm with digital measurement.
Contributes to preventative maintenance K8AB-VS2 AC100/115V PDF.
If the gate function is disabled, the gate input can be used as an,
undercurrent/overcurrent relay or for motor or lamp loads.
Undercurrent detection values can be set separately for CT1 and CT2.
CE marking and cUL certified (K8AC-H2@@@). Control supply voltage: 220 VAC; With voltage fluctuation compensation.
Operating current: 4 to 10 A.
Accurate Detection of Heater Element K8AB-VS2 AC100/115V PDF.
Burnout Regardless of Heater Capacities.
Accurately detects a burned heater element or elements incor,
porated by a molding machine or packing machine and outputs,
an alarm signal.
Precisely singles out the burned element even if one heater el,
ement among several heater elements has been burned out.
Applicable to small- to large-capacity heater elements.
All K2CU-F large-capacity, built-in current transformer models,
work with both single-phase and three-phase heaters.
Voltage fluctuation compensation function eliminates false,
alarms due to variations in the supply voltage. Time specification: Instantaneous type.
Current setting range: 50 to 160 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Manual.
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,,
is indicated from the start of operation K8AB-VS2 AC100/115V datasheet.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequeency, basic,
frequency, and load conditions K8AB-VS2 AC100/115V datasheet. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,