Input type: NPN/ voltage pulse input type.
Event input terminal 5 points (HOLD, RESET) equipped with.
External power supply DC12V80mA.
Note: K3HB-RPB-A, K3HB-RNB-A is not equipped with event input K3HB-VLC-BBCD1 PDF.
DeviceNet; DeviceNet:--.
96 (W) * 48 (H * 95mm) depth.
Power supply voltage: AC100 ~ 240V.
Measurement of 2 points through the speed, time, or cycle of the digital time interval table
K3HB-VLC-BBCD1
Action determine the color, can switch the green / Red 2 kinds of color display.
Measurement of wide range of pulse interval time.
Measuring, calculating and displaying the pulse interval between 2 points.
Pulse interval measurement range, the maximum can be measured from 10ms to 3Input type: DC current input K3HB-VLC-BBCD1 PDF.
Output type: BCD+ transistor; -; NPN open collector (5 bit output +HH, PASS, L, LL).
Event input terminal 5 points (TIMING, S-TIM, HOLD, RESET, ZERO) is equipped with.
External supply 80mA DC12V K3HB-VLC-BBCD1 PDF.
Power suppply voltage: AC100 ~ 240V K3HB-VLC-BBCD1 Manual.
96 (W) * 48 (H * 95mm) depth
Some models are not equipped with.
The most suitable voltage and current signal simulation, measurement and display, identification of the panel table.
Action determine the color, can switch the green / Red 2 kinds of color display OMRON User's Manual.
Equipped with the sub pressure gauge for monitoring the operation trend.
External event input can be applied to a variety of measurement and identification situations.
DTime specification: Inverse type.
Current setting range: 20 to 65 A.
Operating voltage: 200/220/240 VAC OMRON User's Manual.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase OMRON User's Manual.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easily because operation time,
is indicated ffrom the start of operation K3HB-VLC-BBCD1 User's Manual.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, and load conditions K3HB-VLC-BBCD1 Manual. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.