Cable length: 5 m.
The highest level of ionization in its class.
Sensing and variable-AC system provides fast and meticulous ionization.
Linked Ionizers cover a wide area without causing uneven ionization ZJ-BAS-FC05A PDF.
Digital ion display provides simple and reliable settings. Unit: CPU Units.
Name: Economy type (Expansion I/O Units cannot be connected).
No. of I/O points: 10.
LCD display: Yes
ZJ-BAS-FC05A
Power supply voltage: 100 to 240 VAC.
Inputs: 6, 100 to 240 VAC.
Outputs: 4, Relays.
Buttons, calendar, and clock: Yes.
Analog input: NO.
Even Broader Applications with Increased.
Functionality and Higher Precision ZJ-BAS-FC05A PDF.
Increased functionality in a compact body (70 mm wide × 90 mm high).
Easy programming is available using the LCDD and operation,
buttons ZJ-BAS-FC05A Manual. (See note 1.).
This single Unit easily provides relay, timer, counter, and time,
switch functions.
Expansion is easy with Expansion I/O Units, allowing up to 44,
I/O points ZJ-BAS-FC05A PDF. (See note 2.).
Economy-type and Communications-type CPU Units have been,
added to series.
Improved Weekly Timers (See note 1.).
Increased timing accuracy with a monthly deviation of ±15 s,
max. Multiple-day operation and pulse output operation have,
been added OMRON OPERATION MANUAL.
Select from two power supply options:
100 to 240 VAC or 12 to 24 VDC. Item (Measured particle diameter): Air Particle Sensor,
Dust measurement type, 5 µm (10 µm), 20 µm (30 µm), 50 µm min.
Make your entire production environment visible.
Multi-point monitoring of environmental data and central control OMRON OPERATION MANUAL. Power supply: 24 VDC.
Output type: PNP.
ZG2 debut!
Achieving stable measurement.
through innovative technology. Power supply: DC.
Output type: PNP.
Measurable at any position.
The usual limitations, such as the ''measurement,
area being confined to the center''
or ''large errors due to positioning'',
that used to plague laser measuring sensors,
have now been overcome OMRON OPERATION MANUAL ZJ-BAS-FC05A OPERATION MANUAL. Measurements can be,
consistently taken within a 500 mm area,
whatever stage the work is at orr whichever way it is inserted ZJ-BAS-FC05A Manual.
It can now be set to positions without interference from,
the work feed and without limitations of size of work area.