DC input points: 16 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 12 points.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end A1SD62D.
Output form: traansistor output, leakage type.
36 point terminal station.
Number of stations: 4 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program A1SD62D.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A1SD62D MITSUBISHI A1SD62D.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add MITSUBISHI A1SD62D.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness MITSUBISHI A1SD62D.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable -SI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual statee of the scene,
Create the necessary environmental conditions for the operation of the program A1SD62D.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.