Position detection axis number: 1 axis.
Resolution: 4096 * 32 ~ 409.6 * 320 rotation (multi turn), 0.0039062mm/256mm ~ 0.015625mm/1024mm (linear type).
Number of output channels: 16 channels.
When communicating in the PLC network of MITSUBISHI,
There is no sense of difference and discontinuity in the network,
Can carry on the remote monitoring, modification, debuggging and other work of data communication and program,
Without taking into account the level and type of network A1SG62.
MELSECNET/H and CC-Link use the way of loop communication,
Periodically automatically send and receive messages,
Does not require specialized data communication procedures,
Simple parameters can be set A1SG62.
MELSECNET/H and CC-Link are used to transmit and receive the broadcast mode,
This can be done on the network data sharing A1SG62.
For the use of Ethernet, MELSECNET/H, CC-Link network,
Can set the network parameters and various functions, simple and convenient in the Developer GX software screen. 32 point connector for welding (40 pin connector).
Output type: transistor output, source MITSUBISHI A1SG62.
Output points: 16 points.
OFF leakage current: 0.30mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 2 wire.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module MITSUBISHI A1SG62.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong MITSUBISHI A1SG62.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Output points: 8 points.
Output voltage and current: AC100 ~ 240V, 0.6A/1 point, 4A/1 public end.
Response time: 0.5Hz+1ms.
Output form: bidirectional thyristor output.
8 point /1 a public side.
26 point terminal station.
Number of stations: 1 stops.
Type remote I/O units outside of the panel (optical data connection).
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently iin any place of the world,
Build a remote monitoring management system A1SG62.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.