LK166
Home >> Supply >> A2SCPU CPU unit And write it into the corresponding input status register, MITSUBISHI A2SCPU
Search
Information sort

A2SCPU CPU unit And write it into the corresponding input status register, MITSUBISHI A2SCPU


RS-232C connection (QnA/A/FXCPU direct connection, computer connection, micro computer connection).
No clock function.
Applicable model: A956WGOT.
Program memory capacity 14K.
Input and output points to the maximum 512 points.
A scan cycle of PLC must pass through three stages: input sampling, program execution and output refresh A2SCPU.
PLC in the input saampling phase: first of all, in order to scan the sequence of all existing input latches in the input terminal of the state or input data read,
And write it into the corresponding input status register,
Refresh the input, then close the input port, enter the program execution stage A2SCPU. RS-422 1 channel, RS-422/485 1 channel.
Transfer speed: 0.3-19.2kbps.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system A2SCPU.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved MITSUBISHI A2SCPU MITSUBISHI A2SCPU.
Q series PLC in the use of CC-Link function better,
And easier to use. 2 slots.
Can be installed in the power supply unit for A series units installed QnA/ MITSUBISHI A2SCPU.
Cannot extend.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage.
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
I/O points is an important indicator of PLC.
Reasonable selection of I/O points can not only satisfy the control requirements of the system,
And the total investment of the system is the lowest.
The input and output points and types of PLC should be determined according to the analog quantity and switch quantity of the controlled object,
Generally an input / output element to take up an input / output point. A2SCPU.
Taking into account the future adjustment and expansion,
In general should be estimated on the total number of points plus the amount of spare 20%~30%.
The following describes the centralized control system I/O points of the estimate.

Related supply information