AJ65SBTB3-16D5 MITSUBISHI AJ65SBTB3-16D5


Horizontally placed cable.
Length: 300mm.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program AJ65SBTB3-16D5.
Depending on the way the fieldd signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000 AJ65SBTB3-16D5.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: DC24V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system AJ65SBTB3-16D5.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add MITSUBISHI AJ65SBTB3-16D5.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong MITSUBISHI AJ65SBTB3-16D5.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer MITSUBISHI AJ65SBTB3-16D5.
Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC5V/4mA.
External connection: 3 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 line /1 line type.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual statee of the scene,
Create the necessary environmental conditions for the operation of the program AJ65SBTB3-16D5.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.

Related supply information