LK166
Home >> Supply >> AJ71ID1-R4 MITSUBISHI PLC protection and chain procedures MITSUBISHI AJ71ID1-R4
Search
Information sort

AJ71ID1-R4 MITSUBISHI PLC protection and chain procedures MITSUBISHI AJ71ID1-R4


Input type: DC input, negative public end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, source.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function AJ71ID1-R4.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 3 line /2 line type.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector AJ71ID1-R4.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input.
Bus connection.
Program 1 channel connection.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add AJ71ID1-R4.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations MITSUBISHI AJ71ID1-R4. Output points: 4 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
4 point /1 a public side.
Output form: transistor output, leakage type.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered MITSUBISHI AJ71ID1-R4.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system MITSUBISHI AJ71ID1-R4.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. RS-232 1 channel, RS-422/485 1 channel.
Transfer speed: 0.3-19.2kbps.
Computer link function, multi station communication network link function.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points.
Detailed analysis of the process and work characteristics of the controlled object,
To understand thhe coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book AJ71ID1-R4.

Related supply information