LK166
Home >> Price >> OMRON >> Z519-SC1R 3M
Brand sort

OMRON Z519-SC1R 3M

No PHOTO
Brand: OMRON
Country: JAPAN
Name:
Model: Z519-SC1R 3M
Market price: U.S.$ 984.71
(The following are the market open price not sales price!)
OMRON Z519-SC1R 3M
Safety outputs *3: Instantaneous, 3(Semiconductor);
OFF-delayed*2, 2 (Semiconductor).
Auxiliary outputs *4: 2(Semiconductor).
Logical AND connection: Inputs, 1(Semiconductor); Outputs, 1(Semiconductor).
No. of input channels: 1 or 2 channels.
Max. OFF-delay time *1: 150 s.
Rated voltage: 24 VDC .
Terminal block type: Screw terminals Z519-SC1R 3M.
Logical AND Function Adds Flexibility to I/O Expansion.
Facilitates partial or complete control system setup Z519-SC1R 3M
Solid-state outputs (excluding Expansion Units).
Detailed LED indications enable easy diagnosis.
TÜV SÜD certification for compliance,
with IEC/EN61508 (SIL3), EN ISO13849-1 (PLe/Safety Category 4).
Approved by UL and CSA Z519-SC1R 3M.
New unit joins the Series with the following two additional features:
-OFF-delay time of up to 150 seconds can be set .
-Two logical AND connection inputs. No. of poles: 4.
Connection method: Screw-on.
Suitable cable dia: 6 mm (5 to 6).
Core conductor size: 0.18 to 0.75 mm.
Suitable sheath material: PVC, PE, PUR.
Straight Connectors.
Minimum order: 50.
Round Water-resistive Smartclick Z519-SC1R 3M.
Connectors That Reduce Installation Work .
A newly developed lock mechanism that is compatible with round M12 connectors.
Simply insert the Connectors, then turn them approximately 1/8 of a turn to lock.
A positive click indicates locking.
Features the same degree of protection (IP67) as M12 connectors.
A full line-up of models is planned.
Connectors with Cables are UL approved. Time specification: Inverse type.
Current setting range: 50 to 160 A.
Operating voltage: 100/110/120 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked eaasily because operation time,
is indicated from the start of operation Z519-SC1R 3M.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, annd load conditions Z519-SC1R 3M. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
Z519-SC1R 3M Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=Z519-SC1R 3M&select=5


...more relevant model market price >>>>
Related products
Related download