Points: 32 points
.
Rated voltage: DC24V.
Connection type: connector
.
Three remote components can be connected to the CC-LINK system.
Remote I/O: refers to those who require only the ON/OFF control function of the field components, such as digital I/O or pneumatic valve, etc..
In this type of communication can only be carried out in the bit data A1S42Y.
Remote components: refers to those that require processing of the register data of the field components, such as analog I/O and counters, etc
A1S42Y.
In this type of component, in addition to the bit data can be carried out in the register data communication.
Intelligent remote: this type of component is to allow the main station or other stations to access the action, to collect data and control the local PLC station,
GOTS and programmer interface unit are of this type A1S42Y. Function: 4CH voltage / current output.
Adapter for connecting the left extension function of the CPU module.
CPU module can be connected to the left side up to 6 units. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel A1S42Y.
Analog module installation .
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a haard wired way, and the timeliness is strong A1S42Y.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness A1S42Y.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.