DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
4 point /1 a public side.
Positive / negative sharing.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered .
It can avoid the control logic confusion caused by illegal operations A7BDE-J71LP21.
MITSUBISHI PLC initialization procedure
A7BDE-J71LP21 After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A7BDE-J71LP21. .
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A7BDE-J71LP21.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation . "MITSUBISHI inverter series: FR-A846.
Voltage level: three phase 400V.
Power: 90kw.
SLD converter rated current: 260A.
Structure and function: IP55 counterpart.
Type: CA.
Substrate coating: have.
Built in DC reactor.
Easy to operate, simple settings.
We have prepared a series of equipment and functions for you to work in any place to meet the life cycle of the product.
Allegedly, the motor power consumption accounted for about half of the total power generated by manufacturing industry consumption.
How to achieve energy efficiency in the plant without affecting the productivity.
Less energy consumption and more output FR-A800 series inverter will help you to have both fish and bear''s paw"
Parameters and frequency settings can be modified in the program.
Inverter control, for example, by the input signal to trigger the operation of the inverter, based onn the operation of the inverter
The status of the signal output, as well as the monitor output and so on, can be customized according to the requirements A7BDE-J71LP21.
The control of each machine can be done separately by the frequency converter, and the controol of the dispersion is also carried out A7BDE-J71LP21.
Through combining with the real-time clock function can realize the automatic operation (in option FR-LU08). "
A7BDE-J71LP21 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=A7BDE-J71LP21&select=5