Output type: bidirectional controlled silicon.
Output points: 8 points.
Load voltage: AC100-240.
Load current: 1A.
Connection mode: terminal row.
Common public end points: 1.
Structured text language is a programming language that describes a program with a structured description of the text.
It is a programming language similar to a high level language GT10-9PT5S. In large and medium
Structured text is often used to describe the relationship between the various variables in the control system based on the PLC system
GT10-9PT5S
Mainly used for other programming languages more difficult to achieve the user program.
The structured text programming language uses the computer description method to describe the various kinds of relations between the various variables in the system,
Complete the required function or operation GT10-9PT5S.
Most PLC manufacturers use structured text programming language similar to BASIC language, PASCAL language or C language and other advanced languages,
But in order to be convenient, the expression methods of the statement and the types of statements are simplified GT10-9PT5S.
Structured text programming language features: the use of high-level language programming, you can complete the complex control operations,
Need to have a certain level of computer knowledge and programming skills,
Higher requirements for engineering designers . Poor visibility and operability. A1SG60 is an empty cover that is used to plug in the unused I/O slot on the main board or on the extended board.
A1SG60 is a reserved dummy module I/O point to PLC extended I/O system.
With the switch on the module can be set to retain the I/O point,
Can set 16 points, 32 points, 48 points and 64 points. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 line /1 line type.
Fast connector type.
Simple wiring through quick connector.
Can be installed alongg the 6 direction GT10-9PT5S.
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT10-9PT5S.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT10-9PT5S Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT10-9PT5S&select=5