LK166
Home >> Price >> MITSUBISHI >> HG-JR20K14
Brand sort

MITSUBISHI HG-JR20K14

Country: JAPAN
Name: High capacity servo motor in low inertia
Model: HG-JR20K14
Price: 0
MITSUBISHI HG-JR20K14
Screw terminal table type.
High precision / high resolution / high speed 2 piece type terminal.
Voltage / current input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction HG-JR20K14.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram HG-JR20K14
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced HG-JR20K14.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step HG-JR20K14.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be. Length: 5 meters.
Operation panel or parameter unit connection line. DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
4 point /1 a public side.
Positive / negative sharing.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial staate display, etc HG-JR20K14..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram HG-JR20K14.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
HG-JR20K14 Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=HG-JR20K14&select=5


...more relevant model market price >>>>
Related products