LK166
Home >> Price >> OMRON >> 3G3IV-PLKEB27P5
Brand sort

OMRON 3G3IV-PLKEB27P5

No PHOTO
Brand: OMRON
Country: JAPAN
Name:
Market price: U.S.$ 1151.41
(The following are the market open price not sales price!)
OMRON 3G3IV-PLKEB27P5
Unit type: CS1 Special I/O Units.
Connected ID System: V680 Series;
2 Heads.
External power supply : 24 VDC.
No. of unit numbers used: 2 unit number.
Current consumption: 5V, 0.32A; 26V, --;
External, 0.36A.
Communication Unit Dedicated for RFID,
V680 Allowing Direct Connection to,
OMRON PLC CJ/CS/NJ-series .
Communication unit for connecting RFID,
V680-series, which can be used around,
the world, directly to PLC 3G3IV-PLKEB27P5
Allows batch transfer of data up to 32 kbytes.Socket body.
Representative examples of applicable models.
Pole number: 2.
General relay: MY series; MY2.
Socket for MY relay, G2R-S relay.
Save hours of Push-InPlus terminal type to add product series 3G3IV-PLKEB27P5.
Using Plus Push-In terminal, compared with the previous screw terminals,
Save wiring time (compared with the previous screw terminals, can shorten the wiring time of about 60%*) .
Screw will not loose, to achieve maintenance free.
The insertion force is small, the drawing strength is big, and the wiring time is saved, and the high reliability is simultaneously considered 3G3IV-PLKEB27P5.
When connecting multiple strands, the use of non - holding mechanism,
Insert a word screwdriver to keep it .
2 wires can be inserted in each terminal.
DIN guide rail installation, screw mounting common. Time specification: Instantaneous type.
Current setting range: 2 to 8 A.
Operating voltage: 200/220/240 VAC.
Resetting method: Automatic (See note.).
Solid-state Relay Enables Choice of Three.
Operating Functions (Overcurrent, Open,
phase, and Reverse-phase).
Protects 3-phase induction motors and their loads from damage.
Selection and combination of operating functions from overcur,
rent, open-phase, and reverse-phase.
Circuit and output relay operation can be checked by just operat,
ing the test button.
The set time value can be checked easilly because operation time,
is indicated from the start of operation 3G3IV-PLKEB27P5.
Space-saving, integrated construction.
Note: If the K2CM is used with an inverter, the operating conditions will,
depend on the load wiring length, inverter carrier frequency, basic,
frequency, annd load conditions 3G3IV-PLKEB27P5. Error will occur in the operating,
values of the overload elements. It is recommended to test operation,
before using the K2CM.
3G3IV-PLKEB27P5 Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=3G3IV-PLKEB27P5&select=5


...more relevant model market price >>>>
Related products
Related download