MITSUBISHI inverter FR-L740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 22KW.
Integration of the three works the core technology, the outstanding performance of reeling, release the high cost of bright light.
Wide range of professional use and advanced control.
Professional built-in function to ensure the constant material tension, suitable for the application of printing and packaging industry
A273UCPU
Fusion application of the tension products of MITSUBISHI by inverter.
Suitable for tension control of high precision cable and material processing occasions.
Professional function to ensure the safe operation of textile machinery equipment,
The spinning quality and production efficiency are improved A273UCPU. The application of textile machinery and equipment. DC input points: 32 points.
Input voltage and current: 3/7mA, DC12/24V.
Response time: 10ms.
Positive pole sharing.
16 point /1 a public side.
Output points: 24 points.
Output voltage and current: DC12/24V, 0.5A/1 point, 3.2A/1 common end.
Response time: 2ms.
8 point /1 a public end, 4 point /1 a public end A273UCPU.
Output form: transistor output, leakage type .
36 point terminal table * 2.
Number of stations: 8 stops.
Compact remote I/O unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input ennd of the PLC system in a haard wired way, and the timeliness is strong A273UCPU.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too gguarantee the timeliness A273UCPU.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
A273UCPU Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=A273UCPU&select=5