LK166
Home >> Price >> MITSUBISHI >> AD75P2-S3
Brand sort

MITSUBISHI AD75P2-S3

Country: JAPAN
Name: Positioning module
Model: AD75P2-S3
Market price: U.S.$ 2032.2
(The following are the market open price not sales price!)
MITSUBISHI AD75P2-S3
Cable length: 1 meters.
The connection between the A0J2HCPU power supply unit (A0J2-PW) and the GOT. Capacity: 1MB.Extended SRAM card 8MB
To record the change of control data without missing.
Data can be collected in a time interval or in a millisecond time interval,
To record the change of the specified control data without any omission AD75P2-S3.
Therefore, in the event of failure, can quickly determine the cause, the precise action analysis AD75P2-S3Input points: 32 points.
Voltage: AC100 ~ 120V.
Current: 10mA.
Response time: 35ms.
16 points / a common end.
36 point terminal station.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh AD75P2-S3.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read .
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program AD75P2-S3.
The length of the scan cycle is determined by the three .
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selectionn,
Under the premise of meeeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC AD75P2-S3.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation AD75P2-S3.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
AD75P2-S3 Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=AD75P2-S3&select=5


...more relevant model market price >>>>