E81WH4W, QE83WH4W special transformer.
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, current, voltage, power, power factor and frequency of all kinds of detailed information .
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm
GT1055-QSBD-C
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipment GT1055-QSBD-C.
3 phase 3 wire products can be used to measure up to 4 circuits in one slot,
3 phase 4 wire products can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products .
For example, a module can be used to measure other loads from the control panel trunk.
In addition, Works2 GX (version 1 GT1055-QSBD-C. 90U and higher) can be used to easily set parameters . DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc GT1055-QSBD-C..
MITSUBIISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee prrogram GT1055-QSBD-C.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT1055-QSBD-C Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT1055-QSBD-C&select=5