LK166
Home >> Price >> MITSUBISHI >> GT15-70VLTT
Brand sort

MITSUBISHI GT15-70VLTT

Country: JAPAN
Name: Backlight
Model: GT15-70VLTT
Market price: U.S.$ 271.19
(The following are the market open price not sales price!)
MITSUBISHI GT15-70VLTT
2 channels.
200/10kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Compare output: transistor DC12/24V, 0.5A/1 point, 2A/1 common.
20 point terminal station.
Structured text language is a programming language that describes a program with a structured description of the text.
It is a programming language similar to a high level language GT15-70VLTT. In large and medium
Structured text is often used to describe the relationship between the various variables in the control system based on the PLC system GT15-70VLTT
Mainly used for other programming languages more difficult to achieve the user program.
Sequential function flow chart language is designed to satisfy the sequential logic control GT15-70VLTT.
The process of sequential process action is divided into steps and transformation conditions,
According to the transfer condition, the control system is distributed in the function flow sequence,
Step by step according to the sequence of actions .
Each step represents a control function, represented by the box.
In the box, the ladder logic is used to complete the task of the corresponding control function GT15-70VLTT.
This programming language makes the program structure clear and easy to read and maintain,
Greatly reduce the programming workload, shorten the programming and debugging time.
Used in the system of the size of the school, procedures for more complex occasions.
Sequence function flow chart programming language features: to function as the main line, in accordance with the functional flow of the order of distribution, clear, easy to understand the user program,
Avoid the defect of ladder diagram or other languages,
At the same time, the use of ladder language to avoid the use of ladder programming,
Due to the complicated mechanical interlock, the structure of the user program is complex and difficult to understand,
User program scan time is also greatly reduced. Screw terminal table type.
Voltage / current input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulattion debugging to furtherr carry on the on-line unification to adjust GT15-70VLTT.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp bby step GT15-70VLTT.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
GT15-70VLTT Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=GT15-70VLTT&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Resist film
GT15-90PSCB
MITSUBISHI Resist film GT15-90PSCB
Protective film for 15 inch screen. Tran
MITSUBISHI
A0J2HCPU connection cable
GT15-J2C10B
MITSUBISHI A0J2HCPU connection cable GT15-J2C10B
Cale length: 1m. Connection etween a p