The length of the line: 5M.
IP level: IP65.
Direct type.
Bending life: high bending life.
Connector kit for motor electromagnetic brake.
Cable for electromagnetic brake, for HF-KP/HF-MP series (motor shaft with side extraction). Three remote components can be connected to the CC-LINK system.
Remote I/O: refers to the field components that require only ON/OFF control,
Such as digital I/O or pneumatic valve, etc
HC-KFS43 .
In this type of communication can only be carried out in the bit data.
Remote components: the field components that require processing of register data,
For example analog I/O and counter, etc..
In this type of component, in addition to the bit data can be carried out in the register data communication HC-KFS43.
Intelligent remote: this type of element refers to the actions that allow the master station or other station to access,
To collect data and control the local PLC station,
GOTS and programmer interface unit are of this type.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next round of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work HC-KFS43.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
Accordinng to the instruction sequennce number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next rrounnd of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work HC-KFS43 HC-KFS43.
HC-KFS43 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-KFS43&select=5