Total points: 24 points.
Input points: 14 points.
Output points: 10 points.
Voltage: AC220V.
Output type: relay.
Outline dimension: 90*75*90.
FX1N series is a very powerful micro PLC,
Can be extended to up to 128 I/O points,
And can increase the special function module or the expansion board.
Communication and data link function options make FX1N in the volume, communication and special function modules and other important applications is very perfect
HC-SFS202G2 1/20 Motor: HA-MH type super small.
Power: 0.75kw.
Speed: 3000r/min.
Electric machine is a kind of electromagnetic device which can convert or transfer electric energy according to the law of electromagnetic induction HC-SFS202G2 1/20.
In the circuit with the letter M (the old standard with D) said .
Its main function is to produce the driving torque, as a power source of electrical appliances or mechanical.
The generator is represented by the letter G in the circuit.
Its main function is to convert mechanical energy into electrical energy,
At present, the most commonly used, the use of heat, water and other power generator rotor to generate electricity HC-SFS202G2 1/20. Enter 8 points: 24VDC .
4 wire type.
Response time: 1.5ms.
Output 8 points: 24VDC.
Transistor output.
Waterproof connector type.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation ddebugging to furtherr carry on the on-line unification to adjust HC-SFS202G2 1/20.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp bby step HC-SFS202G2 1/20.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
HC-SFS202G2 1/20 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-SFS202G2 1/20&select=5