Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: DC24V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system
HG-JR153
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add HG-JR153.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong .
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness HG-JR153.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer. Power: 22kw.
Purpose: to suppress the power harmonics.
Connected to the inverter input, can be used to improve the power factor, reduce the input side of the high harmonic current.
According to the motor power used to select AC reactor.
(when the inverter capacity is greater than the motor capacity, is still based on the motor capacity to choose.) Three-phase 3 wire type.
Measuring circuit number: 1 circuits.
Measurement items: power consumption (consumption, regeneration), current, voltage, power, power factor, etc..
Power measurement module product group capable of simply measuring various energy information.
With only one module can be used to measure and power consumption (consumption and regeneration), reactive power, current, voltage, power, power factor and frequency of all kinds of detailed information.
No ladder program can continue to monitor the minimum and maximum values, can also perform 2 types of upper / lower limit alarm.
Only in the ON state can be used to measure the output of the output device.
Therefore, the amount of electricity and the quantity of electricity in the unit of the beat can be obtained during the operation of the equipmment HG-JR153.
3 phase 3 wire productts can be used to measure up to 4 circuits in one slot,
3 phase 4 wire products can be used to measure up to 3 circuits,
So the electrical energy measurement can be carried out in a small space by the multi circuit products .
For example, a module ccann be used to measure other loads from the control panel trunk HG-JR153.
In addition, Works2 GX (version 1.90U and higher) can be used to easily set parameters.
HG-JR153 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HG-JR153&select=5