A pack of 20.
AJ65FBTA - - - type.
Input type: DC input, positive public end / negative public end.
Input points: 2 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: relay output.
Output points: 2 points.
OFF leakage current: -.
Output protection function: No.
Rated load voltage / current: DC30V/AC250V/2A MITSUBISHI A6CAP-WP2.
External connection: 2 line /2 line type.
Screw terminal table type
A6CAP-WP2
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition.
Can be installed along the 6 direction. Description: can form up to 8 of the star wiring, as well as the maximum length of the application of the transmission line distribution, waterproof (IP67) structure MITSUBISHI A6CAP-WP2.
Spare 5 products for different purposes.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure.
Spring clip terminal type relay hub.
Star type wiring, length of the main line, spring clamping terminal table type MITSUBISHI A6CAP-WP2.
Relay appliance (T branch) unit.
Extension of T type branch and trunk length.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line.
Relay unit in space light.
Communication between linear moving bodies. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 line /1 line type.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC pprogram simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A6CAP-WP2 A6CAP-WP2.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.