Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/6mA.
External connection: 3 wire.
Spring clamping terminal platform push type input module.
The use of push type, do not need screw fastening, so can reduce the wiring hours.
Can be used for each 1 points to enter the wiring of the broken wire detection.
Wiring abnormality of external power supply can be confirmed.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.
Input type: DC input, positive public end / negative public end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 3 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup AJ65ABTP3-16D MITSUBISHI.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool
AJ65ABTP3-16D Output type: transistor output, drain type.
Output points: 32 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0 AJ65ABTP3-16D MITSUBISHI. 5A.
External connection: 2 wire.
Spring clip terminal.
Do not need to be tightened further or locked with screws, which can reduce the working hours of wiring.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module.
When installing the module can choose to use the DIN guide rail or screw mounting AJ65ABTP3-16D MITSUBISHI.
Can be used for the 3 wire sensor input wiring. Enter 16 points: 24VDC.
Response time 1.5ms.
Waterproof type.
4 wire type.
Waterproof connector type.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on thee on-line unification to adjust AJ65ABTP3-16D.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step AJ65ABTP3-16D.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.