Can carry on the remote monitoring, modification, debugging and other work of data communication and program,
Without taking into account the level and type of network.
Simple parameters can be set.
This can be done on the network data sharing.
Can set the network parameters and various functions, simple and convenient in the Developer GX software screen.
Input and output points: 480 points.
Program capacity: 7K step.
Basic command processing speed: 4.4 ~ 5.6us.
Power supply: input DAC100 ~ 120/200 ~ 240V/ output 2A DC24V, 0.5A DC5V.
Coaxial data communication line function.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way AJ71E71 MITSUBISHI. Easy maintenance.
Relay output interface circuit of PLC
Working process: when the internal circuit output digital signal 1,
There is a current flowing through, the relay coil has a current, and then the normally open contact is closed,
Provide load current and voltage
AJ71E71
When the internal circuit outputs a digital signal 0, there is no current flowing through it,
The relay coil does not have a current, and the normally open contact is broken off,
A current or voltage that is disconnected from the load AJ71E71 MITSUBISHI.
It is through the output interface circuit to the internal digital circuit into a signal to make the load action or not action.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units AJ71E71 MITSUBISHI. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. Input and output points: 512 points.
Input / output data points: 512 points.
Program capacity: 8k.
Basic command processing speed (LD command) S:1.25.
RAM memory capacity: 32K bytes.
DC24V power supply.
DIN rail adapter.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Structured text language is a programming language that describes a program with a structured description of the text.
It is a programming language similar to a high level language. In large and medium-sized PLC systems, structured text is often used to describe the relationship between the variables in the control system.
Mainly used for other programming languagges more difficult to achieve the user program AJ71E71.
Input status and input information input from the input interface,
CPU will be stored in the working data memory or in the input image register.
And then combine the data and the program with CCPU AJ71E71.
The result is stored in the output image register or the working data memory,
And then output to the output interface, control the external drive.