LK166
Home >> Products >> MITSUBISHI >> CC-Link module >> CC-link spare parts >> Connector for connection of special flat cable CL9-CNF-18 MITSUBISHI CL9-CNF-18

Connector for connection of special flat cable CL9-CNF-18 MITSUBISHI CL9-CNF-18

Brand: MITSUBISHI
Name: Connector for connection of special flat cable
Model: CL9-CNF-18
No introduction

RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust MITSUBISHI CL9-CNF-18.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step CL9-CNF-18
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction MITSUBISHI CL9-CNF-18.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced MITSUBISHI CL9-CNF-18. Input type: DC input, positive common end.
Input points: 16 points CL9-CNF-18 MITSUBISHI.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points CL9-CNF-18 MITSUBISHI.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0.1A.
External connection: 1 line /1 line type.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The bassic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program CL9-CNF-18 MITTSUBISHI MITSUBISHI CL9-CNF-18 CL9-CNF-18.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.


...More relevant models >>>>